Rail Infrastructure

Aworth Survey Consultants has extensive experience of working on Network Rail, London Underground and Docklands Light Railway our our dedicated trained team hold all the necessary Network Rail PTS and LUL Track Accustomed permits.

We are Railway Industry Supplier Qualification Scheme (RISQS) accredited with a 5-star maturity rating. RISQS supports the main infrastructure contractors including Network Rail and Transport for London in the management of supply chain risk.

From existing level crossings, track and tunnels that need measuring to a high degree of accuracy, to station buildings that are to be measured to facilitate new ticket barriers and lift installations, Aworth Survey Consultants produce fully detailed plans and profiles of the site, the equipment, plant and track.

Major projects include the measured building surveys and structure surveys for the Network Rail £5.5bn Thameslink Programme at Borough and London Bridge, the existing Charing Cross Station and Stratford Station for the 2012 Olympic Games.

Aworth undertook a major maintenance lighting project at Liverpool Street Station which is undergoing redevelopment to increase capacity, improve accessibility and upgrade interchanges as part of the building of Crossrail.

In addition to physical surveys, Aworth has developed civil asset management databases and mapping for the metro modernisation investment for London Underground (formerly Metronet), to ensure maintenance inspections of civil assets can be identified and located correctly.